[China Glass Net] relying on the front section construction site

Article 1 Workers participating in construction (including apprentices, interns, proprietors, and migrant workers) should be familiar with the safety technical operation procedures of this type of work. In operation, you should stick to your job and stop drinking.

Article 2 Electricians, welders, furnace workers, blasters, crane drivers, driver of pile driver and drivers of various motor vehicles must undergo special training and pass the examination certificate to the operation permit before they can operate independently.

Article 3 Correct use of personal protective equipment and safety precautions. To enter the construction site, you must wear a safety helmet and do not wear slippers or bare feet. Safety belts must be worn in high altitude, cliff and steep slope construction without protective facilities. There are shelters or other isolation facilities for dangerous entrances and exits. Protective railings, baffles or safety nets are required for operations above 2 meters from the ground. Safety helmets, safety belts and safety nets should be inspected regularly. If they do not meet the requirements, it is strictly forbidden to use.

Article 4 Scaffolding, protective facilities, safety signs and warning signs at the construction site shall not be dismantled without authorization. If it is necessary to dismantle, it must be approved by the person in charge of the construction site.

Article 5 The dangerous places such as holes, pits, ditches, hoisting points and funnels at the construction site shall have protective facilities or obvious signs.

Article 6 There must be traffic signs on the construction site. At the intersections where traffic is frequent, there should be a command; on both sides of the train crossing, there should be a drop bar; in dangerous areas, a "dangerous" or "no pass" card should be hung. A red light is displayed at night.

Article 7 The track slope of the construction vehicle and the small flat car shall not exceed 3%. There should be a gear at the end of the rail, and the brakes and hooks of the vehicle should be in good condition.

Article 8 For the construction of pits, the soil quality of the side walls should be checked frequently, and cracks, looseness or support movements should be found. Reinforcement measures should be taken at any time. According to the soil quality, ditch depth, water level, mechanical equipment weight, etc., determine the distance between the stacking material and the construction machinery from the pit side. Transport the material to the pit and apply the signal link.

Article 9 When formulating the acid solution, the acid should be slowly injected into the water and stirred evenly. It is strictly forbidden to pour the water into the acid. Containers for storage of acid should be capped and marked.

Article 10: Women workers should be protected during menstruation, pregnancy and breastfeeding. When a female worker is unable to perform the original job during pregnancy, according to the doctor's certificate, the light work should be exchanged.

Section 2 Electromechanical equipment

Article 1 Mechanical operation, to tighten the cuffs, women workers must be pulled into the cap.

Article 2 The frame of the mechanical and power machine must be stable. Protective devices should be installed in the dangerous parts of the rotation.

Article 3 must check the machinery, instruments, tools, etc. before work, and confirm that they are in good condition.

Article 4 Electrical equipment and circuits must be well insulated, and the wires must not be tied with metal; all kinds of electric motors must be grounded to zero according to regulations, and a single switch should be set; in case of temporary power failure or work stop, it must be locked and locked. .

Article 5 Construction machinery and electrical equipment shall not carry sick operation and overload operation. If it is found to be abnormal, it should be stopped for inspection and must not be repaired during operation.

Article 6 The commissioning of electrical, instrumentation, pipelines and equipment shall be carried out in strict accordance with the individual safety technical measures. It is not allowed to scrub and repair during operation. It is strictly forbidden to extend the head into the mechanical range.

Article 7 shall be powered off under the overhead transmission line. When there is no power outage, there should be isolation protection measures. Cranes must not work under overhead transmission lines, and the boom should be lowered when passing overhead transmission lines. When working on the side of an overhead transmission line, the distance between the boom, wire rope or heavy object and the overhead transmission line shall not be less than the following in any case:

The voltage of the 8th line shall not exceed 36 volts. When working in a wet place or metal container, the line voltage shall not exceed 12 volts.

Article 9 Pressure vessels shall have safety valves and pressure gauges, and shall avoid exposure and collision; oxygen cylinders shall be contaminated with oil; acetylene generators and liquefied petroleum gas shall have safety devices to prevent tempering.

Article 10 X-ray or γ-ray inspection operation area, non-operators are not allowed to enter.

Article 11 In the case of corrosion, dust, radioactivity and toxic operations, protective measures shall be taken and regular experiences shall be carried out.